欧美性大战久久久久xxx|成人精品影院|市来美保av|亚洲一级国产,亚洲欧美在线看,亚洲欧美福利,香水电影在线观看完整版免费未删减

軟題庫 移動APP 掃碼下載APP 隨時(shí)隨地移動學(xué)習(xí) 培訓(xùn)課程
試卷名稱 信息系統(tǒng)項(xiàng)目管理師-pmp練習(xí)題-2
考試中心《信息系統(tǒng)項(xiàng)目管理師-pmp練習(xí)題-2》在線考試
試卷年份2017年下半年
試題題型【單選題】
試題內(nèi)容

The member monitoring the processes looks at the product’s control chart. There are six consecutive points below the mean, but within control limits. The project manager should take which of the following actions?
A、Adjust the process.
B、Create an Ishikawa diagram.
C、Conduct a Design of Experiments.
D、No action is required.


相關(guān)試題

推薦文章
合作網(wǎng)站內(nèi)容